Real estate construction company often acquire suitable land or properties for development. They conduct thorough research & due diligence to select strategic locations that align with market demands.
Please Crate Your E-mail And Subscribe Now*
Call Us Anytime:
+19524357106SL NO | PROJECTS | NATURE OF WORK | CLIENT/ CONSULTANT |
---|---|---|---|
1 | PORTABLE WATER PIPE LINE | SETTING OUT WORKS | OCEAN OIL FIELD |
2 | EXPO 2020 OPERATION BUILDING | AS BUILT SURVEY | ORIGINAL GENERAL MAINTENANCE |
3 | EXPO 2020 | DETAIL, AS BUILT | CENTRO INDUSTRIES |
4 | B+G+1 PRIVATE VILLA, JUMEIRAH BAY | SETTING OUT WORKS | MAJESTIC MOUNTAINS BUILDING CONTRACTING LLC |
5 | UAE PAVILION AT DUBAI EXPO 2020 | 3D SCAN, MONITORING | ARABTEC CONSTRUCTION LLC |
6 | DWC FACILITY | SETTING OUT WORKS | FALA BUILDING MATERIAL TRADING LLC |
7 | AL WATHBA & BEACH PALACE SURVEY WORKS | AS BUILT SURVEY | H.H. SHEIKH MANSOUR BIN ZAYED AL NAHYAN ENGINEERING OFFICE |
8 | PROPOSED VILLA, MAMZAR | SETTING OUT WORKS | SAMA AL MABANI CONTRACTING |
9 | ROADS , BOULEVARDS MODIFICATION | ROAD WORK | FAJER AL MDAEN CONTRACTING LLC |
10 | AL MARYAH CENTRAL | BUILDING SURVEY | BROOK FIELD MULTIPLEX |
11 | PARSONS REGIONAL HEADQUARTERS | BUILDING SURVEY | MULTIPLEX |
12 | HSBC HEAD QUARTERS OFFICE BUILDING | BUILDING SURVEY | MULTIPLEX |
13 | RAW MATERIAL SURVEY | VOLUME CALCULATION | SIJI READY MIX |
14 | DUBAI CREEK HARBOR | PILING WORK | IFG |
15 | EMMAR DOWNTOWN VIEWS II | PILING WORK | IFG |
16 | B4 HOTEL | PILING WORK | IFG |
17 | J568 - BB.A02.016 BUSINESS BAY (I LOVE FLORANCE) | PILING WORK | GFG |
18 | RESIDENTIAL BUILDING@ BUSINESS BAY(5B+G+29+RF) (AHAD TOWER) | PILING WORK | GFG |
19 | G+4P+MC+22+R ON JVC14 BHRA004 @ AL BARSHA SOUTH 4(J-491) | PILING WORK | GFG |
20 | SITE RECTIFICATION WORKS | ANCHOR BOLT SURVEY | MABANI STEEL |
21 | ADDC GHAYATHI PIPE LINE AND PUMP STATION | DETAIL SURVEY | MWH |
22 | PIPE LINE AS BUILT SURVEY | DISCHARGE ROUTE SURVEY | STRONG PLANT |
23 | BLUE WATER CONSTRUCTIONS | CLADDING WORK | ALICO INDUSTRIES |
24 | PLAY GROUND @ SPLASH N PARTY | DETAIL SURVEY | ITHARA GROUP |
25 | DESIGN & CONSTRUCTION OF SEWERAGE TREATMENT PLANT, KALBA | SETTING OUT WORKS | AL AIN GENERAL CONT.EST. |
26 | SEA PALACE, ABU DHABI | INFRA STRUCTURE WORK | AL INAYAH |
27 | INTERNAL ROADS IN DHAID | INFRASTRUCTURE WORK | KATIB & ALAMI |
28 | PROP.6B+G+103+RF RESIDENTIAL BUILDING | CLADDING WORK | GGICO |
29 | Prop. G+4 BUILDING | PILING WORK | SHAIK RASHEED JAMAL NAZAR RASHED AL NOAMI |
30 | Prop. G+3 BLDG @ AL BADA, SATWA, DUBAI | BUILDING SURVEY | ADNAN SAFFARINI |
31 | CITY OF ARABIA | STEEL STRUCTURE SURVEY | IM GALADARI GROUP |
32 | ONE @ PALM,DUBAI & AMC ABU DHABI | HIGH RISE BUILDINGS | BROOK FIELD ENGINEERING |
33 | G+1 VILLA AT HAMIDIYA, AJMAN | LAND SCAPING WORK | HUMAN APPEAL |
34 | VARIOUS PROJECT IN AJMAN | TOPOGRAPHY & A SBUILT | A J DESIGN, AJMAN |
35 | BANIYAN TREE RESORTS, RAK | DETAIL SURVEY AND DRAWING PREPARATION | EMIRATES TENTS |
36 | VARIOUS PROJECTS OF AL ZAMALIK | PILING,HIGH RISE BUILDING | AL ZAMALIK |
37 | LAST EXIT, JABAL ALI VILLAGE | PARKING AND RAMP | E O |
38 | ZAYEED MUHAMMAD FAMILY GATHER, KHAWANEEJ, DUBAI | PARKING | DUBAI MUNCIPALITY |
39 | CITY UNIVERCITY COLLEGE AJMAN | SETTING OUT BUILDING | PRESTIGE & PRO ARC |
40 | VARIOUS PROJECTS | PILING | NAJIM AL OLA |
41 | ICD BROOKFIELD PLACE | BUILDING SURVEY | BROOK FIELD MULTIPLEX |
42 | AL WASL PLAZA EXPO 2020 | AS BUILT ANCHOR BOLT SURVEY | CIMOLAI RIMOND MIDDLE EAST |
43 | ADDC TSE AL AIN | TOPOGRAPHIC SURVEY | STANTEC UK LIMITED |
44 | AL FIYAY MARINE FACILITY | MARINE SURVEY | ADSO / AD PORT |
45 | AL FIYAY MARINE FACILITY | MARINE SURVEY | POLARIS / AD PORT |
46 | SIR BANYAS ISLAND | MARINE SURVEY | ADSO |
47 | MIRFA - AUH | CAUSE WAY CONSTRUCTION | ADSO |
48 | MIRFA - AUH | CAUSE WAY CONSTRUCTION | POLARIS |
49 | YAS ISLAND SOUTH JETTIES | MARINE SURVEY | POLARIS |
50 | MARINE JETTIES (YAS ISLAND) | TUBULAR PILING FOR MARINE JETTIES | AL BANI |
51 | AL QANA MARINA | FLOATING DOCK / GANGWAY | ZARCO |
52 | NATIONAL MARINE DREDGING WORK (AUH) | MARINE SURVEY | ZARCO |
53 | QUAY WALL | MARINE SURVEY | ZARCO |
54 | UAE PAVILION REFURBISHMENT | STRUCTURE WORK | WAAGNER BIRO |
55 | STP PROJECT | SETTING OUT WORKS | UNIVERSAL VOLTAS |
56 | ABU DHABI AIR PORT | STRUCTURE WORK | CHINA STATE |
57 | S5 & S3 LOADING & UNLOADING AREA @ AL BAHIYA | BATHYMETRIC SURVEY & DRAWING PREPARATION | ADSO |
58 | RSW2 @ AL BAHIYA | BATHYMETRIC SURVEY & DRAWING PREPARATION | ADSO |
59 | LAND CIVIL & LOGISTIC SERVICES | OIL & GAS EXPLORATION & WELL PAD CONSTRUCTION | ADSO |
60 | PROPOSED SMART GATE | TOPOGRAPHIC SURVEY, GANTRY LOCATION PROPOSAL, DRAWING PREPARATION & SETTINGOUT | CROSS POINT MIDDLE EAST / AJMAN POLICE |